Cirque du Soleil
·
📺Broadcast
DNYE27 · Vendor Submission

Welcome,
Broadcast.

Welcome to the DNYE27 Broadcast scope. This covers OB compound infrastructure — power for trucks, dedicated network circuit, hardstanding. We've pre-populated indicative requirements; please confirm or refine.

7 Sections

Your Details, Spaces, Power, Network, Local Labour, Machinery, Final Notes.

~ 15–25 minutes

If you have your numbers ready. Skip anything that doesn't apply.

Review & Submit

You'll see a full summary before submitting to CDS Ops.

Note from CDS OpsOB hardstanding (400m² for 4 vehicles), truck power (125A 3-phase × 2), and dedicated broadcast circuit (200Mbps symmetric, UPS-backed) have been pre-populated. Please confirm vehicle loads and bandwidth needs.

Cirque du Soleil · DNYE27